Zhejiang Shenlian Environmental Protection Group Co., Ltd. bidding procurement center commissioned by Zhefu Holding Group, Zhefu Holding Group's Jiangsu Hangfu Environmental Protection Science and Technology Co., Ltd. 7.9387MWp distributed photovoltaic power generation project project design, procurement, installation works for domestic public tender. The conditions for the contract to take effect after the bidding also need to include: project filing, access program procedures and other compliance procedures are complete. Qualified bidding units are invited to bid. After winning the bid, the successful bidder of this project will sign a contract with the project company.
1, Project Overview:
1.1 Project Name: 7.9387MWp Distributed Photovoltaic Power Generation Project in Jiangsu Hang Fu
1.2 Bidding Number:
1.3 Project Description:
The project location is located in Jiangsu Province, Jiangsu Hangfu Environmental Protection Technology Co., Ltd, located in the east longitude 119.999 °, north latitude 32.018 °, according to the actual situation of the current plant, the use of Jiangsu Hangfu Environmental Protection Technology Co., Ltd. of the existing color steel tiles and concrete roofing construction of photovoltaic power stations and ancillary facilities, the color steel tiles roofing no daughter wall, need to consider the addition of a safety guardrail, the overall conditions are good.
1.4 Bidding scope and content:
Bidding scope for Jiangsu Hangfu Environmental Protection Technology Co., Ltd. 7.9387MWp distributed photovoltaic power generation project, the bidding content includes the plant distributed photovoltaic power station project survey, design, procurement and construction of integrated EPC general contracting construction, the specific scope of work includes (but not limited to): the plant photovoltaic field body, the new step-up switchgear (subject to the final grid access), plant collector lines and grid lines engineering survey, design The specific scope of work includes (but is not limited to): engineering survey, design, equipment and material procurement, civil engineering, installation engineering, reinforcement engineering, video monitoring system, water cleaning system, roof maintenance walkway, commissioning test and inspection, trial operation, defect elimination, performance guarantee, acceptance assessment, technical and after-sales service, personnel training and other packages, as well as the warranty responsibility and defects repair after the acceptance of the trial operation, the record of the project, the procedures for access program and other compliance procedures for the project. Program procedures and other compliance procedures, the relevant special pre-grid power acceptance, grid connection and related procedures, grid company docking, plant owner unit related coordination and other all work of the EPC general contracting project, to meet the industry quality standards and through the acceptance of the bidder.
In view of the distributed project in the implementation process may be adjusted according to the actual situation of the capacity, after comprehensive consideration, the EPC contract for this project adopts the form of fixed unit price per watt, the unit price per watt is fixed, and the cost will not be increased during the implementation of the project due to the increase in the volume of work, price increases, policy changes, unforeseen factors and any other factors.
1.5 The total installed capacity of distributed photovoltaic of this project is 7.9387MWp (the details can be adjusted appropriately according to the actual design results).
After the approval of the access system, the total construction period is required to be 120 calendar days, and it is planned that the full capacity will be accessed to the user terminal LAN and supplied to the users by June 2023. (Specific start time is subject to notification by the bidder).
2. Qualified bidders must have the following conditions:
2.1 The bidder should have an independent legal personality in China, with a valid business license; with the necessary personnel, equipment, funds and other aspects of the ability to perform the contract, with the ability to assist the bidder to implement the project on time and grid-connected power generation.
2.2 The bidder must have qualification of engineering design (electric power industry) Grade B or above (can be engaged in the corresponding general contracting business within the scope of the qualification certificate); or have qualification of electric power engineering general contracting Grade III or above.
2.3 The proposed project manager must have a national second-class registered construction engineer license certificate (majoring in construction engineering or electromechanical engineering), and has the performance of EPC general contracting project manager who has undertaken PV power plant projects with a total capacity of 5MW and above (provide the contract or acceptance certificate or user certificate or enterprise appointment letter (with the contract) and other materials with seals).
2.4 Bidders in the past three years (2020-2022) should have at least two single 5MW and above scale photovoltaic project performance (performance is subject to the date of signing the contract), should provide scanned copies of the contract that can prove the performance requirements (must at least contain: contract buyer and seller stamp page, the main content of the contract, the date of signing the contract and the key technical parameters and other information).
2.5 Enterprise Status Requirements: ① not in the order of closure, property was taken over, frozen, bankruptcy, etc.; ② in the bidding period of the project has not been ordered by the competent administrative departments to cancel, suspend, prohibit participation in the bidding and in the penalty validity period; ③ good business reputation, there are no major violations of laws and regulations in economic activities, no false records of financial and accounting information, banking and tax credit evaluation system or enterprise credit system No bad records; ④ the bidder is not a faithless executor, enterprises in the bidding deadline before the "Credit China" website (www.creditchina.gov.cn) of the faithless executor web page screenshot.
2.6 The bidder does not have large or above production safety liability accidents in the past 18 months, and no personal fatal accidents occurred in the group company system in the past 12 months (commitment letter must be provided).
2.7 The project does not accept consortium bidding.
3、Method and time for obtaining bidding documents
3.1 Time of issuing bidding documents: Time of issuing bidding documents: 9:00 a.m. on December 8, 2023 to 11:30 a.m. on December 10, 2023
3.2 Exclusions
3.3 Labor cost of bidding documents: 0 yuan.
4. Tender closing and opening time and place
4.1 Tender closing and opening time: 9:30 a.m. on December 18, 2023; late or non-compliant tender documents will not be accepted.
4.2 Place of delivery of bidding documents: (e-tendering)
4.3 Place of Bid Opening: (Electronic Bid Opening)
Address: 5th Floor, International Trade Office Building, Fuyang District, Hangzhou, Zhejiang Province, China
Contact Person:
Cui Long (13567161056)
Zhao Chengxi (15857153564)